The Northwest Region of São Paulo State, in the South of Brasil, is recognized as a leader in agricultural and related industries. In addition to orange juice production, this region has been also a worldwide leader in the production of sugar and alcohol. The additional energy demand is met through Thermoelectric Power Plants which stimulate demand for natural gas. A 575 km pipeline links this region with the main Bolivia-Brasil Gas Pipeline. Gas network management is realized by a High Speed Industrial Backbone.
A high level of technical integration and co-ordination is required for the successful deployment of this complex system. A Local Area Network utilizing TCP/IP Standard serves the requirements.
Project parameters
Customer: Gas Brasiliano Distribuidora – Concessionária de Gás Canalizado Área Noroeste.
Contract Period: Under development
Contract Value: US$ 900.000
Key Data:
Requirements
Solution
Network topology:
Devices used:
Why Hirschmann™?